The insightful articles, inspiring narrations and analytical perspectives presented by the Editorial Team, establish an alluring connect with the reader. My compliments and best wishes to SP Guide Publications.
"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"
Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.
In anticipation of a backlog for connectivity system upgrades in 2025, Duncan Aviation is encouraging customers to get ahead of the pack by offering sizeable future credits for upgrading from Gogo's legacy air-to-ground (ATG) systems to the AVANCE L3 or AVANCE L5 connectivity platforms. If legacy ATG owner/operators haven't chosen which AVANCE product best suits their needs, Duncan Aviation will offer credit for the installation of Gogo C1, a transitional option that maintains your current in-flight connectivity as Gogo launches its Long-Term Evolution (LTE) network.
As the aviation industry shifts to more robust inflight connectivity systems, Gogo is transitioning its legacy ATG network, which powers the ATG 1000/2000/4000/5000 systems, to new LTE network technology by December 31, 2025. In order to connect to the LTE network, legacy ATG customers must upgrade their hardware.
As this date approaches, Duncan Aviation anticipates operators will be unable to find shop capacity to complete the work before the deadline. To encourage operators to plan ahead and avoid connectivity disruption, Duncan Aviation will be offering credits to customers who schedule a Gogo installation at one of the company's Satellite facilities before the end of 2024.
In December 2024, operators who install a Gogo system on their aircraft can earn between $7,500 to $10,000 as a credit on future avionics work performed on the same aircraft at the same Satellite, depending on the system they choose.
In addition, Gogo is offering generous rebates to customers who upgrade from its legacy ATG systems to the following systems during that same time period:
Gogo introduced the Gogo C1 as a transitional yet efficient solution designed to bridge the gap during the network transition while planning for an upgrade to the more robust, advanced AVANCE platform. Gogo C1 ensures legacy ATG system users maintain their current connectivity and enjoy the same coverage areas, including the contiguous US and portions of Canada and Alaska.
Downtime for installation is minimal, as the C1 is a form-fit box swap that reuses the omnidirectional antennas, tray, wires, cables, and connectors, and the cabin telecommunications router in the ATG systems.
Gogo C1 customers will retain their current Gogo Business Aviation service plans, ensuring a seamless transition with no surprises in subscription or operational costs.