INDIAN ARMED FORCES CHIEFS ON OUR RELENTLESS AND FOCUSED PUBLISHING EFFORTS

 
SP Guide Publications puts forth a well compiled articulation of issues, pursuits and accomplishments of the Indian Army, over the years

— General Manoj Pande, Indian Army Chief

"Over the past 60 years, the growth of SP Guide Publications has mirrored the rising stature of Indian Navy. Its well-researched and informative magazines on Defence and Aerospace sector have served to shape an educated opinion of our military personnel, policy makers and the public alike. I wish SP's Publication team continued success, fair winds and following seas in all future endeavour!"

— Admiral Dinesh Kumar Tripathi, Indian Navy Chief

Since, its inception in 1964, SP Guide Publications has consistently demonstrated commitment to high-quality journalism in the aerospace and defence sectors, earning a well-deserved reputation as Asia's largest media house in this domain. I wish SP Guide Publications continued success in its pursuit of excellence.

— Air Chief Marshal A.P. Singh, Indian Air Force Chief
SP's Military Yearbook 2021-2022
SP's Military Yearbook 2021-2022
       

The President of India to Inaugurate HAL's Integrated Cryogenic Engine Manufacturing Facility (ICMF) in Bengaluru

Bengaluru, India September 26, 2022 Photo(s): By HAL
HAL’s state-of-the-art Integrated Cryogenic Engine Manufacturing Facility (ICMF) in Bengaluru

The President of India, Droupadi Murmu will inaugurate HAL’s state-of-the-art Integrated Cryogenic Engine Manufacturing Facility (ICMF) in Bengaluru on September 27, 2022. The facility will cater to the entire Rocket Engine Manufacturing under one roof for ISRO. The facility will boost self-reliance in manufacturing of Hi-thrust Rocket engines.

The facility is set up over an area of 4500 sqmts housing over 70 hi-tech equipment and testing facilities for manufacturing Cryogenic (CE20) and Semi-cryogenic (SE2000) Engines of Indian Space Launch Vehicles.

Semi-cryogenic Engine

In 2013, an MOU was signed with ISRO for establishing the facility for manufacturing of Cryogenic Engine modules at HAL, Aerospace Division. The MOU for the Cryogenic Engine facility was subsequently amended in the year 2016 for setting up of Integrated Cryogenic Engine Manufacturing Facility (ICMF) with an investment of 208 crores.

The commissioning of all the critical equipment for the manufacturing and assembly requirement is completed. The pre-production activities which involve preparation of the process plans, drawings, quality plan etc. has also commenced. HAL will start realising the modules by March 2023.

HAL Aerospace Division manufactures liquid propellant tanks and launch vehicle structures of PSLV, GSLV MK-II, GSLV Mk-III and also stage integration for GSLV Mk-II. The Aerospace Division entering into manufacture of Cryogenic Engines is a major step in technology up-gradation cum modernization.

Cryogenic Engines are the most widely used engines world over in the launch vehicles. Due to the complex nature of the cryogenic engine, till date only few countries USA, France, Japan, China & Russia have mastered the cryogenic technology. On January 5, 2014 India successfully flew GSLV-D5 with a cryogenic engine (made by ISRO through private industries) and became the sixth country in developing cryogenic engines. Space exploration in the future is mostly dependent upon cryogenic technology.